Woodman Pioneer.
The Pioneer Software Suite consists of 5 main software modules.
-
Quoting
-
Sales Orders
-
Job Costing
-
Material Purchasing and Stock
-
Labour Operation Times (essential for Quoting, Sales Orders and Job Costing)​

Most are essential but some, such as job costing are optional.
Quoting
Quoting Using information from
-
Client/Customer Information​​​
-
Materials Cost
-
Labour Times
​
With this information Pioneer can quote individual items or with the use of a general specification the specified materials can pre load into the items for the job.
In turn this achieves accurate costing.
​
-
Printed Quotation
-
Includes Itemised Costing Reports. (Inc individual material/labour figures)​
-
Summary Costing Report
-
Materials Summary Report
-
Additional Text
-
Special Instructions
-
Payment Terms
-
Thermal and JMF structural calcs.
-
-
Revisions of existing quote​
-
IntelliCAD
-
The Pioneer integrates with a vastly improved CAD system – CMS Intellicad. The CAD scripts utilised by the AVAX CAD engine in the existing Woodman software are totally compatible with the Pioneer Intellicad integration procedure.​
-
​


Sales Order/Production
Sales Order/Production
-
When a quote is accepted, a sales order can be automatically generated from the quote​ or create a sales order on the fly
-
Purchasing
-
Purchase orders can be raised for stocked materials when stock levels fall below a pre-set level, or for buy to order materials purchase orders are raised for a selected production job.​
-
Stock Control
-
This becomes the basis for the production documents, job costing information and delivery notes and invoices.
-
Product labels


Materials
-
Materials
-
Timber​
-
Panel Products
-
Glass
-
Hardware
-
-
Categories and sub categories if required​
-
Material Waste
-
Material Fitting/install times
-
Supplier information for purchase orders
-
Categories can be linked to purchase and sales account ledgers (sales for material items that are re-sold).
-
Stock or buy in
-
Cost overheads allocated to different materials/categories
-
Special Materials (Set up specifically for the job)
-
Surface Coatings and paint finishes
-
Item Weight To Calculate Item weights

Labour
-
Labour times
-
Work centre department or both​
-
Labour operations can be linked to a material hardness / difficulty to work index
-
Labour can also be allocated to a pricing group for quoting
-
Labour is broken down into per lineal meter, each, M2 & M3. (A base structure is given in our installation for personalising to your company)
-






